Description
MANUAL OPERATION
âœ”ï¸ Manual test runs each zone with zone run times from
10 sec. – 10 min.
âœ”ï¸ Manual zone operation of a single zone (1 min. to 9
hrs. 55 min.)
âœ”ï¸ Push button manual start of a program from control
panel
ADDITIONAL FEATURES
â–· Zone-to-zone delay
â–· Master valve timing sequence with zone valve programmable
â–· Master valve/pump start operation assignable On/Off by
zone
â–· Sensor operation assignable On-Off by zone
â–· Includes Cord
Reviews
There are no reviews yet.